Articles | Volume 16, issue 6
https://doi.org/10.5194/se-16-441-2025
https://doi.org/10.5194/se-16-441-2025
Research article
 | 
19 Jun 2025
Research article |  | 19 Jun 2025

Seismic noise characterization for the Buddusò–Ala dei Sardi wind park (Sardinia, Italy) and its impact on the Einstein Telescope candidate site

Giovanni Diaferia, Irene Molinari, Marco Olivieri, Fabio Di Felice, Andrea Contu, Domenico D'Urso, Luca Naticchioni, Davide Rozza, Jan Harms, Alessandro Cardini, Rosario De Rosa, Matteo Di Giovanni, Valentina Mangano, Fulvio Ricci, Lucia Trozzo, Carlo Murineddu, and Carlo Giunchi

Download

Interactive discussion

Status: closed

Comment types: AC – author | RC – referee | CC – community | EC – editor | CEC – chief editor | : Report abuse
  • RC1: 'Comment on egusphere-2024-3600', Laura Ermert, 21 Jan 2025
    • AC1: 'Reply on RC1', Giovanni Diaferia, 04 Mar 2025
  • RC2: 'Comment on egusphere-2024-3600', Klaus Stammler, 25 Feb 2025
    • AC2: 'Reply on RC2', Giovanni Diaferia, 12 Mar 2025

Peer review completion

AR: Author's response | RR: Referee report | ED: Editor decision | EF: Editorial file upload
AR by Giovanni Diaferia on behalf of the Authors (12 Mar 2025)  Author's response   Author's tracked changes   Manuscript 
ED: Referee Nomination & Report Request started (16 Mar 2025) by Simone Pilia
RR by Anonymous Referee #1 (22 Mar 2025)
ED: Publish as is (24 Mar 2025) by Simone Pilia
ED: Publish as is (24 Mar 2025) by CharLotte Krawczyk (Executive editor)
AR by Giovanni Diaferia on behalf of the Authors (24 Mar 2025)  Manuscript 
Download
Short summary
Seismic noise from wind farms can disturb nearby sensitive instruments. We examine the noise of Italy's largest wind farm, located near the proposed site for the third-generation gravitational wave detector. We find that seismic noise is considerable and can be detected up to 13 km distance. Seismic sensors placed at ∼ 250 m depth confirm an excellent level of noise suppression; however, small disturbances in the recorded spectra are detectable when the wind park operates at full capacity.
Share